One path from project selection to controlled job cards. Every figure below comes from the existing calculation engines.
Connections
14
5 configuration(s)
Calculated
1/1
0 awaiting check
Man-hours
16.78
Current calculations
Machine hours
4.52
Not replaceable by labour
Elapsed
—
No card scheduled
Checked cards
0
0 draft(s)
Next step · Connection analysis Requires engineering verification
14 connection(s) resolve to 5 configuration(s); 1 need engineering data.
Fabrication calculations
| Calculation | Connections | Man-h | Machine-h | Elapsed | Cost | Check |
|---|---|---|---|---|---|---|
CALC-DEMO-IPE220-EP-001 IPE 220 → PL 15 | 10 | 16.78 | 4.52 | 12.32 | AED 1,060 | Demo engineering (local record) |
A local check is not a formal engineering approval. Machine-bound work keeps its own duration; adding fitters cannot shorten a cut.