Integrated engineering workflow

Engineering Workspace

One path from project selection to controlled job cards. Every figure below comes from the existing calculation engines.

Connection library
Connections
14
5 configuration(s)
Calculated
1/1
0 awaiting check
Man-hours
16.78
Current calculations
Machine hours
4.52
Not replaceable by labour
Elapsed
—
No card scheduled
Checked cards
0
0 draft(s)
Next step · Connection analysis Requires engineering verification

14 connection(s) resolve to 5 configuration(s); 1 need engineering data.

Project & engineering data

Manage projects
Client
Fictional Petroleum Co.
Type
Pressure Vessel
Due
2026-11-25
Approval
In Review
Parts
7 row(s)
Tender welds
5
Deck rows
0

Demonstration data. Rates, clients and volumes are sample values, not company-approved figures.

Assembly explorer

AssemblyConnectionsProfilesRevision
A-1012IPE 220A
A-1022IPE 220A
A-1032IPE 220A
A-1042IPE 220A
A-1052IPE 220A
A-2011IPE 240A
A-2021IPE 220A
A-2031IPE 220A
A-2041IPE 220A